Our Project Portfolio

COENG

Concentrator pant owner’s team at Bakubung Platinum Mine

SIF PROJECTS
Design review of Track Gun used in Hydro Mining
115 SOLUTIONS

Design of Vertical Diesel Tank & feeding system for Chris Hani Paragwanath Academic Hospital

IZANDO

Design of air-receiver (Pressure Category IV)

THOKO CONSULTING ENGINEERS
THOKO CONSULTING ENGINEERS

Trade-off studies for expansion of Standerton WWTW (Addition of 2 x Biofilters & 1 x Thickener)

SIYANDA BAKGATLA
SIYANDA BAKGATLA UNION SECTION
Engineering visual inspection of inside 4 South Decline Silo

LEGEGERU INDUSTRIES

 Synthesis & definition of physical design of the mobile elevated working platforms (MEWP) to be used by Transnet for maintenance of their Locomotives

ENGINEERED GEARS

 Modal analysis of an all-inclusive (casing, rotor, windings, rotor & stator steel cores) 310kW Traction Motor

LEGEGERU INDUSTRIES

 Design of an extending section of MEWP

DELFT ENGINEERING

 Design of a pump station & dedicated fire tank for Mototolo Concentrate

ENGINEERED GEARS

Cooling analysis of 310kW Traction Motor

ABBEY HLUMBANE

 Design of bathtub lifting chair

DELFT ENGINEERING

 Root-cause identification of failure of the screen cross beams at Anglo American Platinum, Amandelbult Production Service

THARISA MINE

 Root-cause identification of failure of Genesis Jaw Superstructure at Tharisa Mine

TIVANATHI ENGINEERING

 Root-cause identification of Transnet Locomotive Derailment at Ermelo, Yard A Control Point 7

TIVANATHI ENGINEERING

 Vaalriver Barridge safety inspection

TIVANATHI ENGINEERING

 Tent safety inspection before church service in Soweto

TIVANATHI ENGINEERING

 Engineering Visual Audit of Rand Water Panfontein Sludge Disposal Facility

COENG

 Evaluation & validation of Galison Stope Grizzly for blasting mission profile at Lonmin Marikana Mine

SIF PROJECTS

 Synthesize & definition of physical design of the vibrating feeder support superstructure for Moab Khotsong Mine

TIVANATHI ENGINEERING

 Evaluation & validation of a design of charge bucket bogie belonging to Scaw Metal

SIBANYE-STILLWATER

Design of horizontal life line for maintenance of Flotation Cells at Sibanye-Stillwater, Rustenburg Service Operations

SIF PROJECTS

 Design of counterweight of conveyor sampler for Moab Khotsong Mine

COENG

Assessment of pump & NRV failures during fuel offloading from the Wagons at Shell Depo in Nelspruit

COENG

Concentrator plant owners’ team at Bakubung Platinum Mine

AVERNIGROUP

Hydraulic design of a section of Rand Water Gravity Main in Mamelodi

SIMON MILLER

 Design & installation of nitrate removal system for portable water

COENG

Upgrade of wet spent grain silo for SAB Brewery in Alrode Plant

MANGETHE GROUP

Phase 5 HVAC professional engineering service for Telkom North Tower & Annex Buildings

COENG

Design review of the de-watering 450NB expansion pipe piece used at the end of a 13.5km pipeline at Anglo American Mine

SIF PROJECTS

Design of a compressed air column for Great Nolingwa Mine

TIVANATHI ENGINEERING

Design review of efficiency, water and mass balance of Rand Water Panfontein Sludge Disposal Facility

SIF PROJECTS

 Design of a dewatering column for Great Nolingwa Mine

Need A Quote ?

Our team is motivated, experienced and has the resources to make your job a priority.